Follow the guide below to learn how to use line pins to lay out a guideline to aid you in the construction of brick walls.
Step 1 – Insert line pin
Insert your line pin into the brick course. It needs to be positioned so that when you pull out the brick line it runs along the top corner edge of the level you are currently laying.
Step 2 – Insert opposite line pin
Insert another line pin in a position that is opposite to and level with your first line pin.
Step 3 – Suspend a brick line between two pins
Wrap you brick line around your first line pin and unwind it until it reaches your opposite line pin. Secure it, ensuring that it is taut and level.